24/7 emergency call-outs — Havant, Portsmouth & Hampshire24/7 emergency call-outs

info@ssroofingbuilding.com07926 240983
S&S Roofing & Building Limited logo

Re-roofing in Havant, Portsmouth & Hampshire

A new roof in Havantthat outlives the mortgage,not the next storm

Full strip and re-tile with new membrane, battens, fixings and leadwork — priced as one fixed figure before anything is lifted, so you know the exact cost, the exact timeframe and exactly what is going on your house.

Get My Free Fixed Quote07926 240983

Family-run, owner-led roofing · free inspection with a photographic report · £1,000,000 public liability insurance · workmanship guarantee confirmed in writing with your quote.

Re-roofs we have completed

Completed re-roof with red clay tiles and a lead-clad dormer in HavantNew grey slate roof installation finished by S&S Roofing near PortsmouthCompleted tiled roof covering on an outbuilding, photographed from above after a re-roofCompleted re-roof with new slate and tile coverings by S&S Roofing, Hampshire (after)Completed re-roof with new slate and tile coverings by S&S Roofing, Hampshire (1)Completed re-roof with new slate and tile coverings by S&S Roofing, Hampshire (3)
Team of 6
Owner-led roofing team across Hampshire and West Sussex
6-strong
Family-run team, with both owners on the tools
£1m
Public liability insurance
Fixed price
Written quote covering materials and labour
24/7
Phone answered, including during your project

What it is

A re-roof replaces thewhole covering, not justthe bits you can see

A re-roof means stripping the existing tiles or slates back to the rafters, replacing the membrane, battens and fixings, renewing the leadwork and re-covering the roof so the whole system works together again.

Most pitched roofs in Havant, Portsmouth and the surrounding Hampshire villages were built with bitumen felt under the tiles. That felt has a working life, and on housing stock from the 1930s through to the 1980s it is usually long past it. Once the felt has torn along the batten lines, wind-driven rain that gets past the tiles has nothing left to stop it. The tiles can look perfectly respectable from the pavement while the layer that actually keeps water out has failed completely.

That is why we inspect from the inside as well as the outside. Daylight through the felt, dark staining on the rafters, damp battens, nail fatigue where the fixings have rusted through, and sagging between trusses all tell us whether you are looking at a repair or a replacement. We photograph what we find and send it to you, so the decision is based on evidence rather than a roofer's word.

A re-roof is a big job and we treat it as one. Scaffold goes up first — we work regularly with a scaffolding company we trust and can arrange it as part of the job. The roof is stripped in sections so it is never left exposed longer than the weather allows, the timbers are checked and any rotten battens or rafter ends dealt with, then a modern breathable membrane, new treated battens and new fixings go on before the covering.

You get the same fixed price at the end that you agreed at the start. If we open the roof and find something genuinely unforeseen — a rotten wall plate, for instance — we stop, photograph it, and tell you what it means before we do anything that changes the cost. Nothing is added to your bill without you agreeing to it first.

Who it is for

Homeowners with a roof over roughly 50 years old, anyone patching the same roof year after year, landlords who need the problem gone rather than managed, and buyers who have had a roof flagged on a survey.

When it is needed

When the felt has perished, when nail fatigue is dropping tiles regularly, when more than a fifth of the covering is broken or delaminating, or when repairs have stopped holding through a single winter.

Why a professional matters

A re-roof is a system: membrane laps, batten gauge, ventilation, verge and eaves detail, valley and abutment leadwork. Get one element wrong and the roof leaks or rots from inside, however tidy the tiles look.

What is included

Strip and disposal, timber checks, breathable membrane, new treated battens, new fixings, ridge and verge detailing, hand-dressed leadwork where required, and a clean site at the end of every day.

What ignoring it costs

A tired roof does notfail politely — it failsin the middle of a gale

Roofs on the south coast take wind off the Solent and driving rain from the south-west. A covering that is already marginal in October is the one that strips in January, and the damage is rarely limited to the roof itself.

The damage moves indoors

Once water is past the membrane it runs along rafters and drops wherever it finds a gap. Ceilings, insulation, plaster, electrics and decoration all get involved, and the bill for putting those right can exceed the roof work that caused it.

Timber decay compounds

Persistent damp in a loft rots battens, rafter ends and wall plates. Structural timber repairs are the single biggest reason a re-roof price climbs, and every winter you delay is more timber to replace.

Insurance and sale problems

Insurers expect a roof to be maintained. Surveyors flag failed coverings, buyers renegotiate on them, and 'roof needs replacing' on a homebuyer's report costs a seller far more than the job itself would have.

Mistakes we are called out to fix

  • Paying for a fifth round of repairs on a covering that is beyond economical repair
  • Accepting a day-rate quote with no fixed total, then watching it climb once scaffold is up
  • Having tiles re-bedded over perished felt so the real problem is sealed in and hidden
  • Letting a roof be over-boarded or sprayed with foam, which traps moisture and rots the timbers
  • Choosing a covering by price alone, without checking it suits the pitch of the roof
  • Skipping ventilation at the eaves and ridge, so condensation replaces the leak you just fixed

Our process

The same system on everyre-roof job we take on

  1. 01

    Inspection

    We assess the covering, loft, timbers and details by ladder, scaffold or drone survey, and record the condition in photographs.

  2. 02

    Diagnosis

    You get the photographs plus a plain-English explanation of what has failed and whether a repair or a full re-roof is honestly the right call.

  3. 03

    Fixed written price

    An itemised quote covering scaffold, strip, disposal, membrane, battens, fixings, covering and leadwork, with a start date and a duration.

  4. 04

    Strip and re-cover

    The roof is stripped in manageable sections, timbers checked, then membrane, battens, covering, ridge, verges and leadwork installed.

  5. 05

    Check and hand over

    We walk the finished roof, check the details, clear the site, send completion photographs and confirm your workmanship guarantee in writing.

What you get

Concrete outcomes,not vague promises

Decades, not seasons

A correctly specified re-roof with new membrane, battens and fixings resets the clock on the whole covering rather than buying you another two winters.

One fixed figure

Materials and labour are quoted as a single written price. It does not move unless you change the scope, so you can budget with confidence.

No more repair bills

Money that was going into recurring patch-ups every autumn stops. On a roof that has had three or four repairs, a re-roof often pays for itself in avoided call-outs and interior damage.

Safer to live under

Loose and nail-fatigued tiles are a genuine hazard over a driveway, path or pavement. New fixings and correct verge detail take that risk away.

Warmer and drier loft

Breathable membrane with proper eaves and ridge ventilation deals with condensation, keeps insulation dry and keeps insulation working.

Evidence you can keep

Before, during and after photographs plus a written guarantee give you something to show an insurer, a surveyor or a future buyer.

In detail

Materials, methodsand the details thatdecide how long it lasts

Every roof in Havant and Portsmouth is a slightly different problem. Pitch, exposure, existing structure and the look of the street all steer what we specify.

“From start to finish, the service provided was excellent. It is clear that they take great pride in their work and genuinely care about making sure their customers are happy with the finished result. There was no pressure, and I felt confident that I was receiving genuine advice and a fair price. They were also respectful of the property and left everything clean and tidy once the work was finished.”

Sarah WoolleyGoogle review

Concrete and clay tiles

Concrete interlocking tiles are the workhorse of post-war Hampshire housing: strong, economical and available in profiles that match what is already on the street. Clay plain tiles suit older and period properties, weather beautifully and last a very long time, but they are heavier per square metre and need the right batten gauge and structure. We check the existing rafter sizes and spans before specifying anything heavier than what came off.

Natural and fibre-cement slate

Slate suits lower pitches than plain tiles and gives a crisp finish on Victorian and Edwardian houses. Natural slate is graded by thickness and quality and can be nailed or hook-fixed depending on exposure; fibre-cement slate is lighter and cheaper and works well where the structure will not take natural stone. Both need correct head lap for the pitch and the exposure rating of the site — an important point this close to the coast.

Membrane, battens and fixings

Modern breathable membranes replace bitumen felt and let water vapour escape while stopping wind-driven rain. Battens must be graded and treated, gauged accurately to the tile, and fixed to every rafter. Fixings are specified for exposure: on coastal and elevated sites, more of the covering needs mechanically fixing rather than relying on interlock and gravity. Getting these three right is the difference between a roof that lasts and one that fails quietly.

Ventilation and condensation

A sealed loft creates its own water. We build in ventilation at the eaves and at the ridge, or use ventilated dry-fix systems, so warm moist air from the house can escape. Skipping this is a common reason a brand-new roof produces damp patches within a year, and it is a fault nobody can see from the ground.

Dry fix, ridges and verges

Traditional mortar bedding on ridges and verges cracks, releases and becomes a maintenance job in its own right. Dry-fix ridge and verge systems clamp mechanically, ventilate, and remove that recurring failure point. We will quote either, and explain the difference in cost against the difference in future maintenance.

Leadwork, valleys and abutments

Where the roof meets a chimney, a wall, a valley or a bay, lead does the work. It is hand-dressed to code and length, with proper welts, clips and chases, because most re-roofs that leak do so at a detail rather than in the open field of tiles. See our leadwork and chimney pages for how we handle those specific junctions.

Residential and commercial

On homes the priorities are appearance, disruption and price certainty. On commercial and industrial buildings they are access, phasing around occupancy and keeping the building watertight while it is open. We phase commercial strips so no area is left exposed overnight, and we work around trading hours where a business needs to keep running.

Scaffold, access and disruption

Almost every re-roof needs scaffold. We work regularly with a scaffolding firm we trust and include it in the quote so you are not chasing a separate contractor. Skips and disposal are handled by us, the site is swept at the end of every day, and driveways and paths are protected before the strip begins.

Straight answers

Re-roofquestions, answered

Anything not covered here, call 07926 240983. You will speak to an owner, not a salesperson, at any hour of the day.

How much does a re-roof cost in Havant or Portsmouth?+

Every roof is priced individually, because the size, pitch, covering, access and condition of the timbers all change the figure. We inspect free of charge and give you a fixed written price rather than a vague range, and that price is what you pay unless you ask us to change the scope of the work.

How long does a re-roof take?+

A typical semi-detached or terraced house is usually a matter of days rather than weeks once scaffold is up, but the honest answer depends on the size of the roof, the weather and whether timber repairs are needed. We give you a duration with your quote and tell you straight away if anything on site changes it.

Do I need to move out while the roof is replaced?+

No. The house stays occupied throughout. The roof is stripped in sections so it is never left open unnecessarily, and the work is done from scaffold outside rather than through your rooms.

Is my roof repairable, or does it need replacing?+

That is exactly what the free inspection answers. If a repair will genuinely solve it, we will tell you that and quote for the repair — we would rather do a small repair honestly than sell a re-roof that is not needed. If the membrane has perished and the fixings have gone, we will show you the photographs that prove it.

Do you guarantee a new roof?+

Yes. We provide a workmanship guarantee, and the cover varies by job type, so the exact terms for your re-roof are confirmed in writing alongside your quote. Manufacturer warranties on the materials themselves are separate and we will tell you what applies.

How long should a new roof last?+

A correctly installed tiled or slated roof with a modern membrane is a decades-long investment rather than a short-term fix, and the covering itself typically outlasts the membrane beneath it. Lifespan depends on the material chosen, the exposure of the site and whether the roof is maintained — clearing gutters and moss keeps it at its best.

Do you arrange the scaffolding?+

Yes. We work regularly with a scaffolding company we trust and include scaffold in your quote, so you deal with one firm and one price rather than co-ordinating trades yourself.

What happens if you find rotten timber once the roof is open?+

We stop, photograph it and explain what it means before doing anything that affects the price. Nothing is added to your bill without your agreement. Being open about this before we start is why our fixed prices stay fixed.

Can you match the tiles on the rest of my street?+

In most cases yes. Profile, colour and finish are chosen with you before we order, and on conservation-sensitive or period properties we will discuss suitable clay or slate options that keep the character of the building.

Do you cover emergencies during the job?+

The phone is answered 24 hours a day, seven days a week, throughout your project and afterwards. If the weather turns while your roof is open, we are contactable. An emergency call-out fee applies to emergency visits, starting at £50, and may vary depending on travel distance.

Related work

Other things we do on the same roof

Roof repairs

Read more

Leadwork

Read more

Drone surveys

Read more

See every service on our roofing services page, read about the family behind the firm on our about page, or head back to the homepage.

Where we work

Re-roof across Hampshire

  • Havant
  • Emsworth
  • Rowlands Castle
  • Portsmouth
  • Southbourne
  • Southampton
  • Chichester
  • Hampshire
  • West Sussex
View service areas

Free quote

Find out whether your roofneeds replacing — free,with photographs

Send your details and we will arrange a free inspection, photograph the actual condition of the covering, membrane and timbers, and come back with a fixed written price. If a repair will do, we will say so.

  • Free inspection and free quote, no obligation
  • Photographic report of the actual condition
  • Fixed written price, cash or bank transfer
  • Workmanship guarantee, varies by job type
  • £1,000,000 public liability insurance
Call 07926 240983Contact page

S&S Roofing & Building Limited

13 Braishfield Rd, Havant, Hampshire PO9 2HS, UK

Open 24 hours, 7 days a week

Call nowFree quote

We use essential cookies to run this site, and optional ones only if you accept. Cookie Policy.